Welcome to Harris County WCID 36

We proudly serve the Cloverleaf Area inside the 77015 zip code!

Harris County Water Control & Improvement District No. 36 (the "District") is a WCID created in 1943 by order of the Texas Commission on Environmental Quality.

SIGN UP FOR EMERGENCY ALERTS

Brand New App!

Want to make paying your bill even easier? To learn more visit:

Billing App Information

Upcoming Bond Election

LATEST NEWS

December 9, 2025 Public Meeting Notice

Dec 3, 2025

The Harris County Water Control & Improvement District No. 36 (HCWCID 36) Board of Directors will be having a public meeting to discuss district matters.

READ MORE

November 25, 2025 Public Meeting Notice

Nov 19, 2025

The Harris County Water Control & Improvement District No. 36 (HCWCID 36) Board of Directors will be having a public meeting to discuss district matters.

READ MORE

November 12, 2025 Public Meeting Notice

Nov 5, 2025

The Harris County Water Control & Improvement District No. 36 (HCWCID 36) Board of Directors will be having a public meeting to discuss district matters.

READ MORE

The District has constructed and operates water and sanitary sewer facilities to serve its residents.

"Harris County W.C.I.D. No. 36 mission is to operate the District in a manner that meets or exceeds regulatory requirements. We will maintain the District in a way that protects the public health and ensure the financial stability of the District which benefits our entire community. Our objective is to give the best quality service to all of the respected and appreciated customers of Cloverleaf."

"For better unity help your community"

"You must be the change you wish to see in the world"


PUBLIC AWARENESS CERTIFICATION

For Harris County Water Control & Improvement District No. 36

Project No.: 036115 - Facility Scada Improvements
Project cost: $749,469.00

Start date: 11/09/2025
End date: 01/08/2026

This Project is funded by:
Series 2021 TCEQ Bond issue

Project Scope of Work:

Provide and install all electrical equipment including, but not limited to, Control, SCADA & Network Panels, communications equipment, Variable Frequency Drive, Automatic Transfer Switch, Instrumentation and control devices, conduit, wire, and all ancillary devices as shown on construction drawings, Complete in Place.

Demolish and remove existing electrical equipment and conductors as shown on plans.

Allowance for system programming and SCADA applications development and implementation per Section 13325 – System Programming


PUBLIC AWARENESS CERTIFICATION

For HARRIS COUNTY WCID No. 36

Cloverleaf Subdivision

Project No. 036116– Bandera Lift Station Rehabilitation
Project Cost $2,206,436.00

Start date: 11/11/2025
End Date: 12/31/2026

This Project is funded by:
Harris County WCID No. 36 by Series 2021 TCEQ Bond issue

Project Scope of Work:

The Project, Bandera Lift Station Replacement, of which the Work under the Contract Documents is a part, is generally described as follows: Demolition of the existing lift station site and construction of a proposed sixteen-foot (16') diameter submersible lift station including but not limited to a wet well, three (3) submersible pumps with accessories, associated piping, valves, header and force main; manhole; influent sanitary sewer line; a potable water line with backflow preventer; concrete pavement; Natural Gas Powered Emergency Generator, automatic transfer switch, electrical duct banks, conduit, wiring, starters, breakers, control panel; site grading; fence, dewatering, trench safety, and all other items as necessary for a complete functioning lift station.


PUBLIC AWARENESS CERTIFICATION

For HARRIS COUNTY WCID No. 36

Cloverleaf Subdivision

Project No. 036124– Haden Road Force Main
Project Cost $218,880.00

Start date: 11/03/2025
End Date: 02/01/2026

This Project is funded by:
Harris County WCID No. 36 by Haden ACQ, LLC

Project Scope of Work:

Installation of approximately 3,200 linear feet of 2.5-inch force main.


PUBLIC AWARENESS CERTIFICATION

For HARRIS COUNTY WCID No. 36

Cloverleaf Subdivision

Project No. 036118– Hollywood Water Plant Rehabilitation
Project Cost $795,500.00

Start date: 09/16/2025
End Date: 07/29/2026

This Project is funded by: Harris County WCID No. 36 by Haden ACQ, LLC

Project Scope of Work:

The scope of work includes and is not limited to well header coating, booster pump modifications, driveway and sidewalk extensions, miscellaneous electrical improvements, EST piping replacement, and paving of EST floor.